Collington Stormwater Management Improvements

Colling Stormwater Management Project Site

Project Info:

To meet the Stormwater management requirements for the Collington Trade Center Park the existing Stormwater management facility required modifications and upgrades. SaLUT-TLB provided Geotechnical engineering to assess the existing Stormwater embankment for conformance to NRCS Code 378 and requested design modifications which included raising the embankment about 5-feet to increase storage capacity. The Geotechnical services included drilling test boring, laboratory testing and Geotechnical analysis and report.

Project Specs:
  • Completed by:SaLUT, Inc.
  • Completed on:17th March 2014
  • Skills:Geotechnical
  • Client:Maryland DNR