Interstate 95 Express Toll Lanes - Baltimore, MD

I-95 Express Lane Toll Pavement Project

Project Info:

Design and construction of lime and cement stabilized subgrades for highway pavements. During mix design, problems in the chemical reaction of on-site soils and lime were observed. Studied the soil-chemistry and were able to utilize a special Portland cement concrete. Subgrade soils were stabilized and costs reduced by almost $1,000,000.

Project Specs: